Bus Depot Improvement, City of Laguna Beach, CA
 

Accord Engineering was contracted by the City of Laguna Beach to conduct improvement construction at a bus depot to provide better parking and waiting facilities involving the following services: (1) Demolish existing pavement, sidewalk, driveway, and street curbs for the construction of a new parking bay and driveway approach, (2) Construct new PCC parking bay and driveway approach for the bus depot, (3) Construct new sidewalk and pedestrian crossing to accommodate the new parking bay, (4) Install new irrigation system and restore landscape and decorative hardscape in the waiting area.

Challenges and Solutions

The project was partially funded by Measure M and involved right-of-way encroachment permitting and collaboration with Caltrans for meeting their construction standards. Accord Engineering worked closely with the City in obtaining the Caltrans encroachment permit as well as utility companies resolving design issues with conflicting gas lines and a storm drain. The project site is an active bus depot operated by Orange County Transportation Authority. Accord Engineering worked closely with the City on traffic control and detours throughout the construction. All functionality of the bus depot was maintained without interruption.

The City of Laguna Beach is known as an "artist's city" and has a lot of decorative landscape and hardscape (such as artistic benches in the waiting area). Accord Engineering carefully planned the construction sequencing to minimize impact to overall appearance of site during the construction. The artistic hardscape was restored to City plan details. The project was completed on time and below budget without incidents.

 
More pictures from this very important project