View All
 
Services
 
Contracts
Wastewater Treatment Plant Design, Troubleshooting, and Compliance, Twentynine Palms, CA
 

At a training facility, the client needed to build a wastewater treatment facility (WWTF) to handle the wastewater generated by the trainees. The training occurred periodically and lasted from weeks to months. Certain requirements had to be met, such as easy installation and minimum maintenance. Accord Engineering designed a secondary wastewater treatment system that used an anaerobic process to treat the wastewater. Modular systems were used for easy installation and expansion.

Our work included:

  • Engineering evaluation and selection of treatment methods
  • Engineering design of treatment processes
  • Preparing a bid package and solicitation to design/build the new WWTF
  • Evaluating the new WWTF design documents
 
More pictures from this very important project